Site-Specific Safety Plan
Retail Tenant Finish-Out, Suite 140 (sample)
- Subcontractor
- Example Electric, Inc.
- General contractor
- Example Interiors, LLC
- Project site
- 2500 Example Commons Drive, Suite 140, Frisco, TX 75034
- Trades
- Electrical
- Prepared by
- Riley Chen, Foreman
- Approved by
- Alex Example, Owner
- Prepared on
- November 23, 2026
Rule library v0.2.1 (ca7f29ffa4d2) · draft rule library
1.Project information
- Company
- Example Electric, Inc.
- Company address
- 1720 Specimen Road, Irving, TX 75061
- Company phone
- (469) 555-0117
- Contractor license
- TECL 00000 (sample)
- Project
- Retail Tenant Finish-Out, Suite 140 (sample)
- Site address
- 2500 Example Commons Drive, Suite 140, Frisco, TX 75034
- General contractor
- Example Interiors, LLC
- GC contact
- Morgan Reyes, Project Manager, (469) 555-0182
- Owner
- Example Commons Retail, LP
- Start date
- November 30, 2026
- Expected completion
- February 12, 2027
- Work hours
- Monday to Friday, 7:00 am to 3:30 pm; shutdowns after 10:00 pm
- Trades
- Electrical
- Peak crew size
- 5
This site-specific safety plan describes how Example Electric, Inc. will control the hazards of its electrical work at Retail Tenant Finish-Out, Suite 140 (sample). It supplements Example Electric, Inc.'s written safety programs and the general contractor's site safety requirements; it does not replace them.
Example Electric, Inc. keeps a copy of this plan on site, reviews it with the crew before work starts, and updates it when the scope, crew or site conditions change.
2.Safety policy
Example Electric, Inc. is committed to sending every worker home safe from Retail Tenant Finish-Out, Suite 140 (sample). Safety comes before schedule and cost.
Every worker has the authority and the responsibility to stop work they believe is unsafe. No one will be disciplined for stopping work in good faith; the supervisor and the site safety representative resolve the concern before work resumes.
Workers follow this plan, Example Electric, Inc.'s safety rules and the general contractor's site rules. Supervisors enforce them consistently.
3.Responsibilities
- Site safety representative
- Riley Chen
- Safety representative title
- Foreman and Site Safety Representative
- Safety representative phone
- (469) 555-0129
- Safety representative email
- rchen@example-electric.test
- Safety representative qualifications
- OSHA 30-Hour Construction; NFPA 70E qualified person training
- Field supervisor
- Riley Chen
- Field supervisor phone
- (469) 555-0129
Competent and qualified persons
| Role | Required for | Name |
|---|---|---|
| Competent person to train ladder users (29 CFR 1926.1060) |
| Riley Chen |
| Qualified person for work on or near energized parts (29 CFR 1926.416) |
| Riley Chen |
| Silica competent person (29 CFR 1926.1153(g)) |
| Riley Chen |
Riley Chen (Foreman and Site Safety Representative) is Example Electric, Inc.'s site safety representative for this project and the general contractor's contact for safety matters. The safety representative makes sure this plan is followed, attends the general contractor's safety meetings and follows up on corrective actions.
The field supervisor leads daily pre-task planning, checks that workers have the training and equipment their work requires, and stops work when hazards are not controlled.
The competent persons for this job are able to identify existing and predictable hazards in their area of responsibility and are authorized to take prompt corrective measures to eliminate them.
Each worker follows this plan, uses the required protective equipment, takes part in pre-task planning, and reports hazards, injuries and near misses to the supervisor immediately.
4.Drug and alcohol policy
Example Electric, Inc. keeps a drug- and alcohol-free workplace. No one works on this project under the influence of alcohol, illegal drugs or misused prescription drugs, and no one brings them onto the site.
Workers who take a medication that could affect their ability to work safely tell the field supervisor before starting work, without having to name the medication, so their work can be adjusted.
Example Electric, Inc. follows the general contractor's drug and alcohol testing requirements for this project, such as testing before site access, at random, after an incident and on reasonable suspicion, where the law allows them.
A supervisor who reasonably suspects that a worker is impaired removes the worker from work right away, arranges a safe ride home, and follows Example Electric, Inc.'s testing and discipline procedures.
5.Enforcement and discipline
Supervisors enforce this plan, Example Electric, Inc.'s safety rules and the general contractor's site rules the same way for every worker on Example Electric, Inc.'s crew.
Violations are handled in steps: a documented verbal warning, then a written warning, then removal from the project. Each step is recorded with the date, the rule broken and the corrective action, and the general contractor is told of every removal.
A serious violation can mean removal from the project the first time, for example working at height without the required fall protection, working on equipment that has not been locked out when this plan requires it, being impaired by alcohol or drugs, fighting or horseplay, or removing guardrails, covers or barricades without permission.
No worker is disciplined for reporting an injury, an illness, a near miss or a hazard.
6.Scope of work
Example Electric, Inc. will perform electrical work on the Retail Tenant Finish-Out, Suite 140 (sample) project at 2500 Example Commons Drive, Suite 140, Frisco, TX 75034 for general contractor Example Interiors, LLC. Work is scheduled from November 30, 2026 to February 12, 2027, with a peak crew of 5 workers on site. This plan covers the following tasks: install temporary power and lighting; install and bend conduit and raceways; pull wire and cable; set panels, switchboards and transformers; make terminations and connections in panels; install light fixtures and devices; tie in to existing energized systems and switch over; install low-voltage, fire alarm and data cabling; install hangers, supports and anchors overhead; receive, stage and move materials and equipment. New 400-amp tenant panel and feeders, branch circuits, lighting and controls, fire alarm devices and data rough-in for a 6,000-square-foot retail suite in an open shopping center.
| Task | Description |
|---|---|
| Install temporary power and lighting | Temporary panels, cords, receptacles and lighting for the site |
| Install and bend conduit and raceways | EMT, rigid and PVC conduit, fittings and supports |
| Pull wire and cable | Pulling conductors and cable with tuggers, reels and lubricant |
| Set panels, switchboards and transformers | Rig, set and anchor electrical distribution equipment |
| Make terminations and connections in panels | Terminating conductors in panels, gear and equipment |
| Install light fixtures and devices | Fixtures, switches, receptacles and devices |
| Tie in to existing energized systems and switch over | Shutdowns, tie-ins and switchovers in existing buildings |
| Install low-voltage, fire alarm and data cabling | Cable, devices and panels for low-voltage systems |
| Install hangers, supports and anchors overhead | Drill into overhead concrete or steel and set anchors, rod and strut |
| Receive, stage and move materials and equipment | Unloading deliveries, staging and moving materials on site |
The tasks listed are the work Example Electric, Inc. expects to perform on this project, and the task hazard analysis in this plan covers each of them. Work not listed is planned with the field supervisor and added to this plan before it starts.
7.Training
| Topic | Training | Standard |
|---|---|---|
| Hazard communication program | Workers are trained on the hazardous chemicals in their work area, labels and safety data sheets before their first assignment and whenever a new chemical hazard is introduced. |
|
| Silica exposure control plan | Workers covered by the silica standard are trained on silica health hazards, the tasks that expose them, the controls in use and the written exposure control plan. |
|
| Respiratory protection program | Respirator users are medically evaluated, fit tested before first use and at least annually, and trained before first use and at least annually. |
|
| Lockout/tagout procedures | Workers who lock out or tag circuits and equipment are trained in the procedure, and every worker knows never to remove another worker's lock or tag. |
|
| Electrical safety program | Workers who work on or near exposed energized parts are qualified and trained for the voltages and equipment involved. |
|
| Assured equipment grounding conductor program | A competent person implements the program and performs and records the required inspections and tests. |
|
| Hearing conservation program | Workers exposed to high noise are trained on noise hazards and on fitting and wearing hearing protection. |
|
Before starting work on site, every worker attends the general contractor's site orientation and reviews this plan with the field supervisor. Workers receive the training listed above before they do that work.
Workers are instructed in recognizing and avoiding the unsafe conditions of their work and in the regulations that apply to it. Training is given in a language workers understand.
Crew languages on this project: English.
Example Electric, Inc. keeps a training roster for this project that lists each worker with the training and certifications they hold and their dates, such as OSHA 10-hour or 30-hour construction cards, equipment operator and rigging qualifications, and first aid and CPR. The roster, and the records and cards behind it, are available to the general contractor before each worker starts on site and on request.
8.Pre-task planning and safety meetings
At the start of each shift, and again when the work or the conditions change, the field supervisor and the crew complete a written pre-task plan for the day's work: the tasks, their hazards and controls from this plan, any new hazard found on site, and the permits and equipment the work needs. Every crew member signs it before starting work.
The field supervisor holds a toolbox talk with the crew at least once a week, on a topic tied to the current work and in a language the crew understands, and records the date, the topic and who attended.
Completed pre-task plans and toolbox talk records are kept on site with this plan and given to the general contractor on request.
9.Task hazard analysis
Install temporary power and lighting
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders |
|
|
|
| Contact with energized circuits |
|
|
|
| Temporary power and cord-connected tools |
| - |
|
Install and bend conduit and raceways
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install temporary power and lighting” above. |
|
|
| Struck by falling tools and materials |
|
|
|
| Chemical products |
|
|
|
| Hand and power tools |
|
|
|
| Cuts from sheet metal and sharp edges |
|
|
|
| Manual handling and lifting |
|
|
|
Pull wire and cable
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install temporary power and lighting” above. |
|
|
| Caught in rotating equipment |
|
|
|
| Chemical products | Same controls as under “Install and bend conduit and raceways” above. |
|
|
| Manual handling and lifting | Same controls as under “Install and bend conduit and raceways” above. |
|
|
Set panels, switchboards and transformers
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Contact with energized circuits | Same controls as under “Install temporary power and lighting” above. |
|
|
| Manual handling and lifting | Same controls as under “Install and bend conduit and raceways” above. |
|
|
Make terminations and connections in panels
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Contact with energized circuits | Same controls as under “Install temporary power and lighting” above. |
|
|
| Arc flash and arc blast |
|
|
|
| Unexpected start-up or release of stored energy |
|
|
|
Install light fixtures and devices
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install temporary power and lighting” above. |
|
|
| Struck by falling tools and materials | Same controls as under “Install and bend conduit and raceways” above. |
|
|
| Contact with energized circuits | Same controls as under “Install temporary power and lighting” above. |
|
|
Tie in to existing energized systems and switch over
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Contact with energized circuits | Same controls as under “Install temporary power and lighting” above. |
|
|
| Arc flash and arc blast | Same controls as under “Make terminations and connections in panels” above. |
|
|
| Unexpected start-up or release of stored energy | Same controls as under “Make terminations and connections in panels” above. |
|
|
Install low-voltage, fire alarm and data cabling
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install temporary power and lighting” above. |
|
|
| Struck by falling tools and materials | Same controls as under “Install and bend conduit and raceways” above. |
|
|
Install hangers, supports and anchors overhead
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install temporary power and lighting” above. |
|
|
| Struck by falling tools and materials | Same controls as under “Install and bend conduit and raceways” above. |
|
|
| Respirable crystalline silica dust |
|
|
|
| Noise |
|
|
|
| Hand and power tools | Same controls as under “Install and bend conduit and raceways” above. |
|
|
Receive, stage and move materials and equipment
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Struck by vehicles and mobile equipment |
|
|
|
| Manual handling and lifting | Same controls as under “Install and bend conduit and raceways” above. |
|
|
| Slips, trips and poor housekeeping |
|
|
|
The crew reviews the hazards and controls for each task in the daily pre-task plan, before the work begins, and adds any hazard found that day. Controls are listed in order of preference: eliminate the hazard, then engineering and work-practice controls, then personal protective equipment. A hazard that several tasks share has its controls listed under the first of those tasks.
If site conditions differ from this analysis, workers stop and the supervisor updates the plan with the crew before work continues.
10.Site-specific conditions
The preparer identified 7 site conditions at the Retail Tenant Finish-Out, Suite 140 (sample) site that add the following hazards to this plan: falls from ladders; falls and tip-overs from aerial and scissor lifts; struck by falling tools and materials; striking embedded conduit, cables or post-tension tendons; contact with energized circuits; arc flash and arc blast; temporary power and cord-connected tools; respirable crystalline silica dust; noise; powder-actuated tools; occupants and the public near the work. The table below lists the hazards each condition adds and where their controls are. Other site hazards identified by the preparer: Neighboring tenants stay open during the work; the service tie-in to the center's main switchboard is scheduled after hours with the property manager.
| Site condition | Hazards | Controls | Standard |
|---|---|---|---|
| Ladders |
|
|
|
| Boom or scissor lifts |
|
|
|
| Work on or near energized electrical equipment |
|
|
|
| Cutting, coring, drilling or grinding concrete or masonry |
|
|
|
| Occupied building or public nearby |
|
|
|
| Powder-actuated tools |
|
|
|
| Temporary power and extension cords |
|
|
|
Other hazards identified for this site
Neighboring tenants stay open during the work; the service tie-in to the center's main switchboard is scheduled after hours with the property manager.
Example Electric, Inc. tells the general contractor about any new site hazard it identifies, and follows the general contractor's controls for hazards created by other trades.
11.Written safety programs
| Program | Written program | Why it applies | Standard |
|---|---|---|---|
| Hazard communication program | Required |
|
|
| Silica exposure control plan | Required when: workers cut, drill, grind or otherwise disturb concrete, masonry or other silica-containing materials, unless exposure will stay below 25 micrograms per cubic meter (8-hour TWA) under any foreseeable conditions (29 CFR 1926.1153(a)). |
|
|
| Respiratory protection program | Required when: respirators are necessary to protect workers or the employer requires them (29 CFR 1910.134(c), applied to construction by 1926.103); workers whose only use is voluntary filtering facepieces (dust masks) need only the Appendix D information. |
|
|
| Lockout/tagout procedures | Required when: workers service or maintain machines or equipment in an operating facility under general-industry rules, which call for a written energy control program with documented procedures (29 CFR 1910.147). Construction work on circuits requires de-energized circuits and controls to be locked or tagged (29 CFR 1926.417), without a written program. |
|
|
| Electrical safety program | Recommended |
|
|
| Assured equipment grounding conductor program | Required when: the employer uses an assured equipment grounding conductor program instead of GFCIs on temporary-power receptacles (29 CFR 1926.404(b)(1)(iii)); GFCI protection needs no written program. |
|
|
| Hearing conservation program | Recommended |
|
|
Example Electric, Inc. keeps the written programs listed above separately from this plan and makes them available to the general contractor and to workers on request.
The field supervisor keeps the chemical inventory, a list of every hazardous chemical product Example Electric, Inc. brings on site by the product identifier on its safety data sheet, together with the safety data sheets in the site copy of this plan, where workers can read them during every shift (29 CFR 1910.1200(e)(1) and (g)(8)). Both are updated before a new product comes on site.
Example Electric, Inc. gives the general contractor a copy of the chemical inventory before work starts, and other employers on site can see its safety data sheets through the field supervisor (29 CFR 1910.1200(e)(2)).
12.Personal protective equipment
| PPE | Specification | Required for | Standard |
|---|---|---|---|
| Hard hat | ANSI/ISEA Z89.1 hard hat; Class E where electrical hazards exist |
|
|
| Safety glasses | ANSI/ISEA Z87.1 safety glasses with side protection |
|
|
| Face shield | ANSI/ISEA Z87.1 face shield worn over safety glasses |
|
|
| Hearing protection | Earplugs or earmuffs suited to the noise level |
|
|
| Cut-resistant gloves | ANSI/ISEA 105 cut level suited to sheet metal and cut pipe |
|
|
| Chemical-resistant gloves | Glove material listed on the product's safety data sheet |
|
|
| Safety-toe footwear | Safety-toe boots meeting ASTM F2413 (the successor to ANSI Z41.1, which 1926.96 references) |
|
|
| High-visibility garment | ANSI/ISEA 107 Class 2 or 3 vest or shirt |
|
|
| Personal fall arrest system | Full-body harness with a shock-absorbing or self-retracting lanyard and a suitable anchorage |
|
|
| Respirator | NIOSH-approved respirator selected and fit tested under the respiratory protection program |
|
|
| Voltage-rated gloves | ASTM D120 rubber insulating gloves of the class for the voltage, with leather protectors, tested at the required intervals |
|
|
| Arc-rated clothing and face protection | Arc rating at or above the incident energy at the working distance |
|
|
Workers wear hard hats, safety glasses and safety-toe footwear in active work areas, plus the task-specific equipment listed above, unless the general contractor's rules require more.
Example Electric, Inc. provides the required protective equipment, trains workers in its use, and replaces it when it is damaged or worn out.
13.Emergency action plan
- Emergency number
- 911
- Site address for responders
- 2500 Example Commons Drive, Suite 140, Frisco, TX 75034
- Nearest hospital
- Example Medical Center Frisco (sample)
- Hospital address
- 900 Sample Boulevard, Frisco, TX 75035
- Hospital phone
- (469) 555-0105
- Assembly point
- Front sidewalk at the center's monument sign
- First-aid kit
- Electrical gang box by the suite's rear door
- Fire extinguishers
- Rear door and by the temporary panel
- First-aid/CPR responder
- Riley Chen (First aid/CPR)
- General contractor contact
- Morgan Reyes, Project Manager, (469) 555-0182
- Additional contacts
- Center property manager: (469) 555-0195
In an emergency, call 911 first, then notify the field supervisor and the general contractor. Give the dispatcher the site address shown above and send someone to meet responders at the site entrance.
When an alarm sounds or the general contractor orders an evacuation, workers stop work, make equipment safe if they can do so without risk, and go to the assembly point: Front sidewalk at the center's monument sign. The supervisor accounts for every worker and reports anyone missing to responders.
First-aid supplies are kept at: Electrical gang box by the suite's rear door. Workers report every injury, however minor, to the supervisor right away.
The field supervisor checks the weather forecast before each shift and watches for severe weather alerts during it. When thunder is heard or lightning is seen, outdoor work stops and workers take shelter in a building or an enclosed vehicle until 30 minutes after the last thunder. Before high winds or other severe weather, the crew secures loose materials and equipment if it is safe to do so and follows the general contractor's severe weather plan.
14.Incident reporting
Workers report every injury, illness, near miss and property damage to the field supervisor immediately. The supervisor notifies the general contractor immediately, leaves the scene as it is except to help the injured or prevent further harm, and gives the general contractor a written incident report within 24 hours, on its form if it has one.
Example Electric, Inc. reports to OSHA any work-related fatality within 8 hours, and any work-related in-patient hospitalization, amputation or loss of an eye within 24 hours (29 CFR 1904.39).
The supervisor and the site safety representative investigate each incident to find its causes, correct them and share the lessons with the crew.
15.Coordination with the general contractor
Example Electric, Inc. follows the general contractor's site safety rules and attends its coordination and safety meetings. The field supervisor coordinates daily with Example Interiors, LLC and other trades on overlapping work such as overhead work, shutdowns and work in shared areas.
Example Electric, Inc. does not remove or alter guardrails, hole covers, barricades or other protection installed by others. If the work requires it, the field supervisor arranges it with the general contractor and replaces the protection before leaving the area.
Hazards created by other employers are reported to the general contractor, and Example Electric, Inc. workers stay out of areas where they would be exposed to uncontrolled hazards.
If Example Electric, Inc. brings lower-tier subcontractors to this project, it tells the general contractor before they start. Each lower-tier subcontractor follows this plan and the general contractor's site rules, attends the site orientation, and sends its workers' training records, and any lift plans or permits its work needs, to the general contractor through Example Electric, Inc.
16.Inspections
The field supervisor inspects the work area at the start of each shift and as work changes. Competent persons make the inspections that the controls in this plan call for, and workers check their tools and equipment before use.
Hazards found are corrected immediately, or the area is barricaded until they are. Example Electric, Inc. takes part in the general contractor's site inspections and closes out its findings.
17.Crew acknowledgment
By signing below, each worker confirms that this plan was reviewed with them, that they understand the hazards and controls of their work, and that they will follow it and stop work if conditions become unsafe.
Crew acknowledgment
| Name | Company | Signature | Date |
|---|---|---|---|
18.Approval
This plan was prepared by Riley Chen (Foreman) and approved by Alex Example (Owner) for Example Electric, Inc. Example Electric, Inc. is responsible for its content and for reviewing it against actual site conditions.
- Prepared by
- Riley Chen, Foreman
- Approved by
- Alex Example, Owner
- Date
- November 23, 2026
Signatures
| Role | Name | Signature | Date |
|---|---|---|---|
Appendix: Referenced standards
Standards cited by the controls, programs and PPE in this plan.
| Standard | Title |
|---|---|
| 29 CFR 1910.134 | Respiratory protection (written program in paragraph (c)) |
| 29 CFR 1910.147 | The control of hazardous energy (lockout/tagout), general industry |
| 29 CFR 1910.1200(e)(1) | Hazard communication: written program |
| 29 CFR 1910.1200(e)(2) | Hazard communication: multi-employer workplaces |
| 29 CFR 1926.25 | Housekeeping |
| 29 CFR 1926.28 | Personal protective equipment |
| 29 CFR 1926.34 | Means of egress |
| 29 CFR 1926.52 | Occupational noise exposure |
| 29 CFR 1926.56 | Illumination |
| 29 CFR 1926.59 | Hazard communication (applies 29 CFR 1910.1200) |
| 29 CFR 1926.95 | Criteria for personal protective equipment |
| 29 CFR 1926.96 | Occupational foot protection |
| 29 CFR 1926.97 | Electrical protective equipment |
| 29 CFR 1926.100 | Head protection |
| 29 CFR 1926.101 | Hearing protection |
| 29 CFR 1926.102 | Eye and face protection |
| 29 CFR 1926.103 | Respiratory protection (applies 29 CFR 1910.134) |
| 29 CFR 1926.200 | Accident prevention signs and tags |
| 29 CFR 1926.300 | Hand and power tools: general requirements |
| 29 CFR 1926.302 | Power-operated hand tools (incl. powder-actuated tools) |
| 29 CFR 1926.303 | Abrasive wheels and tools |
| 29 CFR 1926.404 | Wiring design and protection (GFCI / assured grounding program) |
| 29 CFR 1926.416 | Electrical safety-related work practices: general requirements |
| 29 CFR 1926.417 | Lockout and tagging of circuits |
| 29 CFR 1926.451 | Scaffolds: general requirements |
| 29 CFR 1926.452 | Scaffolds: specific types (incl. mobile scaffolds) |
| 29 CFR 1926.453 | Aerial lifts |
| 29 CFR 1926.454 | Scaffolds: training requirements |
| 29 CFR 1926.501 | Duty to have fall protection |
| 29 CFR 1926.502 | Fall protection systems criteria and practices |
| 29 CFR 1926.601 | Motor vehicles |
| 29 CFR 1926.602 | Material handling equipment |
| 29 CFR 1926.1053 | Ladders |
| 29 CFR 1926.1060 | Training requirements (stairways and ladders) |
| 29 CFR 1926.1153 | Respirable crystalline silica |
| 29 CFR 1926.1153(g) | Respirable crystalline silica: written exposure control plan |