Site-specific safety plan (SSSP): template, sample and builder
A site-specific safety plan is the document a general contractor asks each subcontractor for before mobilizing: how your company will do its work safely on this site. Skip the blank template. Answer the job questions and SitePack assembles the plan from a rule library of tasks, hazards, controls and OSHA citations.
- Free to build and preview
- About 10 minutes
- Word and PDF
Start your SSSP: pick your trade
Free to build and preview. Pay only to download.
Start your site-specific safety plan
Answer questions about the job. Fixed rules pick the hazards, controls and OSHA citations, and you review the whole plan on screen before you pay.
Trades on this job
Pick at least one trade to continue.
The basics
What is a site-specific safety plan?
A site-specific safety plan (SSSP) applies your company's safety program to one project. It names the people responsible, describes your scope of work, lists every task your crew will perform with its hazards and controls, and covers the written programs, training, PPE and emergency procedures that apply on that site.
General contractors require one from each subcontractor because they coordinate many employers on one site. The GC keeps a site-wide plan; yours covers your crew, your work and how it fits the GC's site rules. It is usually due before mobilization, sometimes with the name of your safety representative days ahead of your start date.
Federal OSHA rules don't require a document by that name, but they do require specific written programs and accident prevention programs (29 CFR 1926.20(b)). The SSSP requirement itself usually comes from your subcontract or the owner.
Before you mobilize
What GCs typically ask subcontractors for
Requirements differ by GC and owner, but these come up on most commercial jobs. A SitePack plan addresses each one: it fills in the details from your answers and lists the written programs the job calls for.
A written site-specific safety plan
Your scope, your crew and how you will control the hazards of this job, on this site. Not the company manual with a new cover page.
A named safety representative
Someone on your side the GC can call, often with a phone number and a note on training. Some subcontracts want the name days before you start.
Emergency details
Nearest hospital, emergency number, assembly point, first-aid and extinguisher locations, and who reports an incident to whom.
Task hazard analyses
Called JHAs, JSAs or AHAs depending on the GC: each task your crew performs, its hazards, the controls and the PPE.
Written programs
Hazard communication and any other written programs the work triggers, such as fall protection or lockout, with the standards behind them.
Training and competent persons
Proof your crew is trained for the work and the names of the competent or qualified persons the hazards call for.
Template or builder?
A template gives you headings. The builder fills them in.
Free SSSP templates are a fine start if you have the time to research every task. Here's the difference.
| Item | Blank template | SitePack builder |
|---|---|---|
| Hazards for the tasks you actually do | You research and type them | Loaded by rule from the tasks you pick |
| Controls, PPE and OSHA citations | Look them up yourself | From the rule library, with citations |
| Written programs the job calls for | Guesswork | Listed by rule, with when each is required |
| Missing emergency or contact details | Easy to miss | Completeness check blocks export |
| Editable Word file | Usually | Yes, plus PDF |
| Cost | Free | Free to build and preview; $49 per job to download |
Plan contents
The 19 sections of a SitePack plan
The same structure on every job, filled with that job's details. You review and confirm each one before export.
- 1
Project information
Company, site, GC, dates and crew
- 2
Safety policy
Commitment and stop-work authority
- 3
Responsibilities
Safety representative, supervisor, competent persons, workers
- 4
Drug and alcohol policy
Fitness for duty, impairment and the general contractor's testing requirements
- 5
Enforcement and discipline
Progressive discipline and removal from the project
- 6
Scope of work
Narrative and selected tasks
- 7
Training
Training the applicable programs require, and the training roster
- 8
Pre-task planning and safety meetings
Daily written pre-task plans and weekly toolbox talks
- 9
Task hazard analysis
Hazards, controls, PPE and standards per task
- 10
Site-specific conditions
Site conditions answered yes and other hazards
- 11
Crane and rigging lift plan
Written lift plans, critical lifts and the load path
- 12
Written safety programs
Programs the job calls for
- 13
Personal protective equipment
PPE for this job
- 14
Emergency action plan
Emergency contacts and procedures, including severe weather
- 15
Incident reporting
Reporting and investigation
- 16
Coordination with the general contractor
Multi-employer coordination and lower-tier subcontractors
- 17
Inspections
Site and equipment inspections
- 18
Crew acknowledgment
Crew sign-in
- 19
Approval
Prepared-by and approved-by signatures
Site-specific safety plan sample
A sample plan for HVAC work
Generated by the same rules as your plan, from a fictional company and job. Here is one task's hazard analysis; each full sample has every section, as your GC would receive it.
9. Task hazard analysis · Set or replace rooftop units
Example Mechanical, LLC · Medical Office Building - Rooftop Unit Replacement (sample) · GC: Example Builders, Inc.
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from roof edges and open sides |
|
|
|
| Falls through skylights, roof openings and floor holes |
|
|
|
| Unexpected start-up or release of stored energy |
|
|
|
| Refrigerant exposure and frostbite |
|
|
|
| Manual handling and lifting |
|
|
|
Read a full sample plan: HVAC · Plumbing · Electrical
By trade
Site-specific safety plans by trade
Each trade page loads that trade's tasks into the builder and shows its hazards, standards and a full sample.
- HVACHeating, ventilation, air conditioning and refrigeration17 tasks · 8 written programs by defaultHVAC safety plan
- PlumbingWater, waste, vent, storm and fuel gas piping and fixtures18 tasks · 6 written programs by defaultPlumbing safety plan
- ElectricalPower, lighting, low-voltage and temporary power17 tasks · 7 written programs by defaultElectrical safety plan
FAQ
Site-specific safety plan questions
What is a site-specific safety plan (SSSP)?
A written plan for one project that says how your company will do its work safely on that site: who is responsible, which tasks your crew will perform, the hazards of each task and how they are controlled, the written programs and training that apply, PPE, and what to do in an emergency. General contractors usually require one from every subcontractor before mobilization.
Is there a free site-specific safety plan template?
Plenty, and they are a fine starting point if you have time to fill them in. A template gives you headings; you still research the hazards for each task, find the standards and write the controls. SitePack's builder fills those from a rule library based on your answers. Building and previewing is free; downloading the Word and PDF files is $49 per job.
Who writes the SSSP: the general contractor or the subcontractor?
Usually both. The GC keeps a site-wide safety plan for the project, and the subcontract asks each subcontractor for its own plan covering its scope, its crew and its hazards, plus a named safety representative. Your plan has to fit inside the GC's site rules, so ask for them before you finish yours.
Is a site-specific safety plan required by OSHA?
Federal OSHA rules do not use the term for subcontractors, but they do require specific written programs (hazard communication, for example) and require employers to run accident prevention programs (29 CFR 1926.20(b)). The SSSP requirement usually comes from the GC's subcontract or the owner, and some public owners and cities have their own versions.
When is the plan due?
Whenever your subcontract says. Some ask for the plan and the name of your safety representative several days before you start (one published sample subcontract asks for both 10 days ahead); others want it at the pre-mobilization meeting. Late plans can hold up your start, so check the safety exhibit early.
What does the AI do, and what doesn't it do?
Fixed rules decide the content: which hazards, controls, written programs, PPE and citations go into the plan, based on the trades, tasks and site conditions you pick. No AI is involved in those choices.
AI only drafts the two narrative paragraphs (scope of work and site conditions) when you click Draft, working from your own answers. It cannot add or remove hazards or programs, its text is checked against your selections, and it stays flagged in the plan until you approve or rewrite it. Prefer to write them yourself? Skip the Draft button.
Build your site-specific safety plan
Answer the job questions, review every section, and preview the whole plan free.