Site-Specific Safety Plan
Medical Office Building - Rooftop Unit Replacement (sample)
- Subcontractor
- Example Mechanical, LLC
- General contractor
- Example Builders, Inc.
- Project site
- 1200 Example Parkway, Plano, TX 75074
- Trades
- HVAC
- Prepared by
- Dana Whitfield, Safety Manager
- Approved by
- Chris Example, Operations Manager
- Prepared on
- November 9, 2026
Rule library v0.2.1 (ca7f29ffa4d2) · draft rule library
1.Project information
- Company
- Example Mechanical, LLC
- Company address
- 410 Sample Industrial Blvd, Garland, TX 75041
- Company phone
- (972) 555-0142
- Contractor license
- TACLA00000C (sample)
- Project
- Medical Office Building - Rooftop Unit Replacement (sample)
- Site address
- 1200 Example Parkway, Plano, TX 75074
- General contractor
- Example Builders, Inc.
- GC contact
- Jordan Lee, Superintendent, (214) 555-0187
- Owner
- Example Medical Properties, LP
- Start date
- November 16, 2026
- Expected completion
- January 29, 2027
- Work hours
- Monday to Friday, 6:30 am to 3:30 pm
- Trades
- HVAC
- Peak crew size
- 6
This site-specific safety plan describes how Example Mechanical, LLC will control the hazards of its HVAC work at Medical Office Building - Rooftop Unit Replacement (sample). It supplements Example Mechanical, LLC's written safety programs and the general contractor's site safety requirements; it does not replace them.
Example Mechanical, LLC keeps a copy of this plan on site, reviews it with the crew before work starts, and updates it when the scope, crew or site conditions change.
2.Safety policy
Example Mechanical, LLC is committed to sending every worker home safe from Medical Office Building - Rooftop Unit Replacement (sample). Safety comes before schedule and cost.
Every worker has the authority and the responsibility to stop work they believe is unsafe. No one will be disciplined for stopping work in good faith; the supervisor and the site safety representative resolve the concern before work resumes.
Workers follow this plan, Example Mechanical, LLC's safety rules and the general contractor's site rules. Supervisors enforce them consistently.
3.Responsibilities
- Site safety representative
- Dana Whitfield
- Safety representative title
- Safety Manager
- Safety representative phone
- (972) 555-0163
- Safety representative email
- safety@example-mechanical.test
- Safety representative qualifications
- OSHA 30-Hour Construction
- Field supervisor
- Marco Diaz
- Field supervisor phone
- (972) 555-0158
Competent and qualified persons
| Role | Required for | Name |
|---|---|---|
| Competent person to train ladder users (29 CFR 1926.1060) |
| Marco Diaz |
| Competent person to train workers on fall protection (29 CFR 1926.503) |
| Marco Diaz |
| Qualified rigger and qualified signal person (29 CFR 1926.1425, 1926.1428) |
| Ray Okafor, Example Crane Rental (sample) |
| Qualified person for work on or near energized parts (29 CFR 1926.416) |
| Kevin Tran |
| Silica competent person (29 CFR 1926.1153(g)) |
| Dana Whitfield |
Dana Whitfield (Safety Manager) is Example Mechanical, LLC's site safety representative for this project and the general contractor's contact for safety matters. The safety representative makes sure this plan is followed, attends the general contractor's safety meetings and follows up on corrective actions.
The field supervisor leads daily pre-task planning, checks that workers have the training and equipment their work requires, and stops work when hazards are not controlled.
The competent persons for this job are able to identify existing and predictable hazards in their area of responsibility and are authorized to take prompt corrective measures to eliminate them.
Each worker follows this plan, uses the required protective equipment, takes part in pre-task planning, and reports hazards, injuries and near misses to the supervisor immediately.
4.Drug and alcohol policy
Example Mechanical, LLC keeps a drug- and alcohol-free workplace. No one works on this project under the influence of alcohol, illegal drugs or misused prescription drugs, and no one brings them onto the site.
Workers who take a medication that could affect their ability to work safely tell the field supervisor before starting work, without having to name the medication, so their work can be adjusted.
Example Mechanical, LLC follows the general contractor's drug and alcohol testing requirements for this project, such as testing before site access, at random, after an incident and on reasonable suspicion, where the law allows them.
A supervisor who reasonably suspects that a worker is impaired removes the worker from work right away, arranges a safe ride home, and follows Example Mechanical, LLC's testing and discipline procedures.
5.Enforcement and discipline
Supervisors enforce this plan, Example Mechanical, LLC's safety rules and the general contractor's site rules the same way for every worker on Example Mechanical, LLC's crew.
Violations are handled in steps: a documented verbal warning, then a written warning, then removal from the project. Each step is recorded with the date, the rule broken and the corrective action, and the general contractor is told of every removal.
A serious violation can mean removal from the project the first time, for example working at height without the required fall protection, working on equipment that has not been locked out when this plan requires it, being impaired by alcohol or drugs, fighting or horseplay, or removing guardrails, covers or barricades without permission.
No worker is disciplined for reporting an injury, an illness, a near miss or a hazard.
6.Scope of work
Example Mechanical, LLC will perform HVAC work on the Medical Office Building - Rooftop Unit Replacement (sample) project at 1200 Example Parkway, Plano, TX 75074 for general contractor Example Builders, Inc. Work is scheduled from November 16, 2026 to January 29, 2027, with a peak crew of 6 workers on site. This plan covers the following tasks: set or replace rooftop units; install ductwork and hangers overhead; recover, evacuate and charge refrigerant; braze and solder refrigerant and copper lines; start up, test and balance systems; install hangers, supports and anchors overhead; install, test and connect fuel gas piping; receive, stage and move materials and equipment. Replace four packaged rooftop units (10 to 25 tons) on new curb adapters, reconnect supply and return ductwork, gas piping, power and controls, and start up, test and balance the new units.
| Task | Description |
|---|---|
| Set or replace rooftop units | Disconnect, rig and set packaged rooftop units and curbs; reconnect duct, power, gas and controls |
| Install ductwork and hangers overhead | Hang duct, supports and accessories from ladders, scaffolds or lifts |
| Recover, evacuate and charge refrigerant | Connect gauges and recovery equipment; evacuate, leak-check and charge systems |
| Braze and solder refrigerant and copper lines | Torch brazing and soldering, including nitrogen purging |
| Start up, test and balance systems | Energize, start, test and balance equipment and airflow |
| Install hangers, supports and anchors overhead | Drill into overhead concrete or steel and set anchors, rod and strut |
| Install, test and connect fuel gas piping | Fuel gas piping, connections to equipment, purging and testing |
| Receive, stage and move materials and equipment | Unloading deliveries, staging and moving materials on site |
The tasks listed are the work Example Mechanical, LLC expects to perform on this project, and the task hazard analysis in this plan covers each of them. Work not listed is planned with the field supervisor and added to this plan before it starts.
7.Training
| Topic | Training | Standard |
|---|---|---|
| Hazard communication program | Workers are trained on the hazardous chemicals in their work area, labels and safety data sheets before their first assignment and whenever a new chemical hazard is introduced. |
|
| Fall protection training and certification | Each worker who might be exposed to fall hazards is trained by a competent person to recognize them and to use the fall protection on site; the training is recorded in a written certification. |
|
| Silica exposure control plan | Workers covered by the silica standard are trained on silica health hazards, the tasks that expose them, the controls in use and the written exposure control plan. |
|
| Respiratory protection program | Respirator users are medically evaluated, fit tested before first use and at least annually, and trained before first use and at least annually. |
|
| Lockout/tagout procedures | Workers who lock out or tag circuits and equipment are trained in the procedure, and every worker knows never to remove another worker's lock or tag. |
|
| Electrical safety program | Workers who work on or near exposed energized parts are qualified and trained for the voltages and equipment involved. |
|
| Assured equipment grounding conductor program | A competent person implements the program and performs and records the required inspections and tests. |
|
| Hot work permit procedure | Workers who do hot work or serve as fire watch are trained in the permit procedure and in using the fire extinguisher at the work location. |
|
| Crane lift planning | The crane operator is certified or qualified, the signal person is qualified, and loads are rigged by a qualified rigger where the crane rules require one. |
|
| Hearing conservation program | Workers exposed to high noise are trained on noise hazards and on fitting and wearing hearing protection. |
|
Before starting work on site, every worker attends the general contractor's site orientation and reviews this plan with the field supervisor. Workers receive the training listed above before they do that work.
Workers are instructed in recognizing and avoiding the unsafe conditions of their work and in the regulations that apply to it. Training is given in a language workers understand.
Crew languages on this project: English, Spanish.
Example Mechanical, LLC keeps a training roster for this project that lists each worker with the training and certifications they hold and their dates, such as OSHA 10-hour or 30-hour construction cards, equipment operator and rigging qualifications, and first aid and CPR. The roster, and the records and cards behind it, are available to the general contractor before each worker starts on site and on request.
8.Pre-task planning and safety meetings
At the start of each shift, and again when the work or the conditions change, the field supervisor and the crew complete a written pre-task plan for the day's work: the tasks, their hazards and controls from this plan, any new hazard found on site, and the permits and equipment the work needs. Every crew member signs it before starting work.
The field supervisor holds a toolbox talk with the crew at least once a week, on a topic tied to the current work and in a language the crew understands, and records the date, the topic and who attended.
Completed pre-task plans and toolbox talk records are kept on site with this plan and given to the general contractor on request.
9.Task hazard analysis
Set or replace rooftop units
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from roof edges and open sides |
|
|
|
| Falls through skylights, roof openings and floor holes |
|
|
|
| Unexpected start-up or release of stored energy |
|
|
|
| Refrigerant exposure and frostbite |
|
|
|
| Manual handling and lifting |
|
|
|
Install ductwork and hangers overhead
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders |
|
|
|
| Struck by falling tools and materials |
|
|
|
| Hand and power tools |
|
|
|
| Cuts from sheet metal and sharp edges |
|
|
|
| Manual handling and lifting | Same controls as under “Set or replace rooftop units” above. |
|
|
Recover, evacuate and charge refrigerant
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Compressed gas cylinders |
|
|
|
| Refrigerant exposure and frostbite | Same controls as under “Set or replace rooftop units” above. |
|
|
Braze and solder refrigerant and copper lines
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Fire from brazing, soldering, welding and torch cutting |
|
|
|
| Compressed gas cylinders | Same controls as under “Recover, evacuate and charge refrigerant” above. |
|
|
| Chemical products |
|
|
|
| Brazing and welding fumes |
| - |
|
Start up, test and balance systems
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Contact with energized circuits |
|
|
|
| Arc flash and arc blast |
|
|
|
| Unexpected start-up or release of stored energy | Same controls as under “Set or replace rooftop units” above. |
|
|
| Noise |
|
|
|
Install hangers, supports and anchors overhead
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Falls from ladders | Same controls as under “Install ductwork and hangers overhead” above. |
|
|
| Struck by falling tools and materials | Same controls as under “Install ductwork and hangers overhead” above. |
|
|
| Respirable crystalline silica dust |
|
|
|
| Noise | Same controls as under “Start up, test and balance systems” above. |
|
|
| Hand and power tools | Same controls as under “Install ductwork and hangers overhead” above. |
|
|
Install, test and connect fuel gas piping
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Caught in rotating equipment |
|
|
|
| Flammable liquids and gases |
|
|
|
| Fuel gas leaks during piping and purging |
|
|
|
| Stored energy during pressure testing |
|
|
|
| Hand and power tools | Same controls as under “Install ductwork and hangers overhead” above. |
|
|
Receive, stage and move materials and equipment
| Hazard | Controls | PPE | Standard |
|---|---|---|---|
| Struck by vehicles and mobile equipment |
|
|
|
| Manual handling and lifting | Same controls as under “Set or replace rooftop units” above. |
|
|
| Slips, trips and poor housekeeping |
|
|
|
The crew reviews the hazards and controls for each task in the daily pre-task plan, before the work begins, and adds any hazard found that day. Controls are listed in order of preference: eliminate the hazard, then engineering and work-practice controls, then personal protective equipment. A hazard that several tasks share has its controls listed under the first of those tasks.
If site conditions differ from this analysis, workers stop and the supervisor updates the plan with the crew before work continues.
10.Site-specific conditions
The preparer identified 12 site conditions at the Medical Office Building - Rooftop Unit Replacement (sample) site that add the following hazards to this plan: falls from ladders; falls from roof edges and open sides; falls through skylights, roof openings and floor holes; falls and tip-overs from aerial and scissor lifts; struck by suspended loads; struck by falling tools and materials; struck by vehicles and mobile equipment; striking embedded conduit, cables or post-tension tendons; temporary power and cord-connected tools; fire from brazing, soldering, welding and torch cutting; compressed gas cylinders; flammable liquids and gases; fuel gas leaks during piping and purging; stored energy during pressure testing; respirable crystalline silica dust; noise; brazing and welding fumes; occupants and the public near the work. The table below lists the hazards each condition adds and where their controls are. Other site hazards identified by the preparer: Rooftop air intakes for the occupied clinic are next to two of the units; coordinate with the building engineer before brazing or running engine-driven equipment near them.
| Site condition | Hazards | Controls | Standard |
|---|---|---|---|
| Work 6 feet or more above a lower level |
|
|
|
| Skylights, roof openings or floor holes |
|
|
|
| Ladders |
|
|
|
| Boom or scissor lifts |
|
|
|
| Crane, boom truck or hoist lifts |
|
|
|
| Brazing, soldering, welding or torch cutting |
|
|
|
| Cutting, coring, drilling or grinding concrete or masonry |
|
|
|
| Occupied building or public nearby |
|
|
|
| Vehicle traffic or moving equipment |
|
|
|
| Temporary power and extension cords |
|
|
|
| Natural gas or propane piping |
|
|
|
| Pressure testing |
|
|
|
Other hazards identified for this site
Rooftop air intakes for the occupied clinic are next to two of the units; coordinate with the building engineer before brazing or running engine-driven equipment near them.
Example Mechanical, LLC tells the general contractor about any new site hazard it identifies, and follows the general contractor's controls for hazards created by other trades.
11.Crane and rigging lift plan
No crane, boom truck or hoist lift is made on this project without a written lift plan. A qualified person prepares it, such as the crane company's lift planner or Example Mechanical, LLC's lift supervisor, and reviews it before the lift with the operator, the qualified rigger, the signal person and the general contractor.
Each lift plan records the crane's make, model and configuration and the date of its last annual inspection; the operator's certification; the weight of the load, including rigging; the lift radius, the rated capacity at that radius and the percent of capacity used; ground conditions and outrigger support; clearance from power lines; the wind limit; the rigging; the swing radius, exclusion zone and load path; and the names of the qualified rigger and the qualified signal person.
A lift is a critical lift when the load is more than 75 percent of the crane's rated capacity at the planned radius, when the load passes over an occupied building or area, or when more than one crane lifts the load. Example Mechanical, LLC and the general contractor approve a critical lift's plan before the lift, and a multiple-crane lift also needs a plan developed by a qualified person (29 CFR 1926.1432).
Loads do not pass over occupied areas unless the lift plan allows it and the area below is cleared or protected as the general contractor and the building owner approve. Where available, the load travels a route that keeps workers' exposure to it to a minimum (29 CFR 1926.1425).
12.Written safety programs
| Program | Written program | Why it applies | Standard |
|---|---|---|---|
| Hazard communication program | Required |
|
|
| Fall protection training and certification | Required |
|
|
| Silica exposure control plan | Required when: workers cut, drill, grind or otherwise disturb concrete, masonry or other silica-containing materials, unless exposure will stay below 25 micrograms per cubic meter (8-hour TWA) under any foreseeable conditions (29 CFR 1926.1153(a)). |
|
|
| Respiratory protection program | Required when: respirators are necessary to protect workers or the employer requires them (29 CFR 1910.134(c), applied to construction by 1926.103); workers whose only use is voluntary filtering facepieces (dust masks) need only the Appendix D information. |
|
|
| Lockout/tagout procedures | Required when: workers service or maintain machines or equipment in an operating facility under general-industry rules, which call for a written energy control program with documented procedures (29 CFR 1910.147). Construction work on circuits requires de-energized circuits and controls to be locked or tagged (29 CFR 1926.417), without a written program. |
|
|
| Electrical safety program | Recommended |
|
|
| Assured equipment grounding conductor program | Required when: the employer uses an assured equipment grounding conductor program instead of GFCIs on temporary-power receptacles (29 CFR 1926.404(b)(1)(iii)); GFCI protection needs no written program. |
|
|
| Hot work permit procedure | Recommended |
|
|
| Crane lift planning | Recommended |
|
|
| Hearing conservation program | Recommended |
|
|
Example Mechanical, LLC keeps the written programs listed above separately from this plan and makes them available to the general contractor and to workers on request.
The field supervisor keeps the chemical inventory, a list of every hazardous chemical product Example Mechanical, LLC brings on site by the product identifier on its safety data sheet, together with the safety data sheets in the site copy of this plan, where workers can read them during every shift (29 CFR 1910.1200(e)(1) and (g)(8)). Both are updated before a new product comes on site.
Example Mechanical, LLC gives the general contractor a copy of the chemical inventory before work starts, and other employers on site can see its safety data sheets through the field supervisor (29 CFR 1910.1200(e)(2)).
13.Personal protective equipment
| PPE | Specification | Required for | Standard |
|---|---|---|---|
| Hard hat | ANSI/ISEA Z89.1 hard hat; Class E where electrical hazards exist |
|
|
| Safety glasses | ANSI/ISEA Z87.1 safety glasses with side protection |
|
|
| Face shield | ANSI/ISEA Z87.1 face shield worn over safety glasses |
|
|
| Filter lenses for brazing and soldering | Shade number for the operation (torch soldering: shade 2; torch brazing: shade 3 or 4) |
|
|
| Hearing protection | Earplugs or earmuffs suited to the noise level |
|
|
| Cut-resistant gloves | ANSI/ISEA 105 cut level suited to sheet metal and cut pipe |
|
|
| Chemical-resistant gloves | Glove material listed on the product's safety data sheet |
|
|
| Brazing gloves and flame-resistant clothing | Leather gauntlet gloves; flame-resistant or natural-fiber clothing |
|
|
| Safety-toe footwear | Safety-toe boots meeting ASTM F2413 (the successor to ANSI Z41.1, which 1926.96 references) |
|
|
| High-visibility garment | ANSI/ISEA 107 Class 2 or 3 vest or shirt |
|
|
| Personal fall arrest system | Full-body harness with a shock-absorbing or self-retracting lanyard and a suitable anchorage |
|
|
| Respirator | NIOSH-approved respirator selected and fit tested under the respiratory protection program |
|
|
| Voltage-rated gloves | ASTM D120 rubber insulating gloves of the class for the voltage, with leather protectors, tested at the required intervals |
|
|
| Arc-rated clothing and face protection | Arc rating at or above the incident energy at the working distance |
|
|
Workers wear hard hats, safety glasses and safety-toe footwear in active work areas, plus the task-specific equipment listed above, unless the general contractor's rules require more.
Example Mechanical, LLC provides the required protective equipment, trains workers in its use, and replaces it when it is damaged or worn out.
14.Emergency action plan
- Emergency number
- 911
- Site address for responders
- 1200 Example Parkway, Plano, TX 75074
- Nearest hospital
- Example Regional Medical Center (sample)
- Hospital address
- 500 Sample Avenue, Plano, TX 75075
- Hospital phone
- (972) 555-0100
- Assembly point
- North parking lot by the GC's trailer
- First-aid kit
- Example Mechanical gang box at the base of the roof ladder
- Fire extinguishers
- At each hot work location and in the GC's trailer
- First-aid/CPR responder
- Marco Diaz (First aid/CPR)
- General contractor contact
- Jordan Lee, Superintendent, (214) 555-0187
- Additional contacts
- Building engineer: (214) 555-0199
In an emergency, call 911 first, then notify the field supervisor and the general contractor. Give the dispatcher the site address shown above and send someone to meet responders at the site entrance.
When an alarm sounds or the general contractor orders an evacuation, workers stop work, make equipment safe if they can do so without risk, and go to the assembly point: North parking lot by the GC's trailer. The supervisor accounts for every worker and reports anyone missing to responders.
First-aid supplies are kept at: Example Mechanical gang box at the base of the roof ladder. Workers report every injury, however minor, to the supervisor right away.
Workers who use personal fall arrest have a rescue plan so that a fallen worker can be reached promptly; suspended workers are rescued as quickly as possible.
If a fire starts during hot work, workers stop the work, use the fire extinguisher only on a small fire they can safely put out, and evacuate and call 911 if it grows.
The field supervisor checks the weather forecast before each shift and watches for severe weather alerts during it. When thunder is heard or lightning is seen, outdoor work stops and workers take shelter in a building or an enclosed vehicle until 30 minutes after the last thunder. Before high winds or other severe weather, the crew secures loose materials and equipment if it is safe to do so and follows the general contractor's severe weather plan.
15.Incident reporting
Workers report every injury, illness, near miss and property damage to the field supervisor immediately. The supervisor notifies the general contractor immediately, leaves the scene as it is except to help the injured or prevent further harm, and gives the general contractor a written incident report within 24 hours, on its form if it has one.
Example Mechanical, LLC reports to OSHA any work-related fatality within 8 hours, and any work-related in-patient hospitalization, amputation or loss of an eye within 24 hours (29 CFR 1904.39).
The supervisor and the site safety representative investigate each incident to find its causes, correct them and share the lessons with the crew.
16.Coordination with the general contractor
Example Mechanical, LLC follows the general contractor's site safety rules and attends its coordination and safety meetings. The field supervisor coordinates daily with Example Builders, Inc. and other trades on overlapping work such as overhead work, shutdowns and work in shared areas.
Example Mechanical, LLC does not remove or alter guardrails, hole covers, barricades or other protection installed by others. If the work requires it, the field supervisor arranges it with the general contractor and replaces the protection before leaving the area.
Hazards created by other employers are reported to the general contractor, and Example Mechanical, LLC workers stay out of areas where they would be exposed to uncontrolled hazards.
If Example Mechanical, LLC brings lower-tier subcontractors to this project, it tells the general contractor before they start. Each lower-tier subcontractor follows this plan and the general contractor's site rules, attends the site orientation, and sends its workers' training records, and any lift plans or permits its work needs, to the general contractor through Example Mechanical, LLC.
17.Inspections
The field supervisor inspects the work area at the start of each shift and as work changes. Competent persons make the inspections that the controls in this plan call for, and workers check their tools and equipment before use.
Hazards found are corrected immediately, or the area is barricaded until they are. Example Mechanical, LLC takes part in the general contractor's site inspections and closes out its findings.
18.Crew acknowledgment
By signing below, each worker confirms that this plan was reviewed with them, that they understand the hazards and controls of their work, and that they will follow it and stop work if conditions become unsafe.
Crew acknowledgment
| Name | Company | Signature | Date |
|---|---|---|---|
19.Approval
This plan was prepared by Dana Whitfield (Safety Manager) and approved by Chris Example (Operations Manager) for Example Mechanical, LLC. Example Mechanical, LLC is responsible for its content and for reviewing it against actual site conditions.
- Prepared by
- Dana Whitfield, Safety Manager
- Approved by
- Chris Example, Operations Manager
- Date
- November 9, 2026
Signatures
| Role | Name | Signature | Date |
|---|---|---|---|
Appendix: Referenced standards
Standards cited by the controls, programs and PPE in this plan.
| Standard | Title |
|---|---|
| 29 CFR 1910.134 | Respiratory protection (written program in paragraph (c)) |
| 29 CFR 1910.147 | The control of hazardous energy (lockout/tagout), general industry |
| 29 CFR 1910.1200(e)(1) | Hazard communication: written program |
| 29 CFR 1910.1200(e)(2) | Hazard communication: multi-employer workplaces |
| 29 CFR 1926.21 | Safety training and education |
| 29 CFR 1926.25 | Housekeeping |
| 29 CFR 1926.28 | Personal protective equipment |
| 29 CFR 1926.34 | Means of egress |
| 29 CFR 1926.52 | Occupational noise exposure |
| 29 CFR 1926.56 | Illumination |
| 29 CFR 1926.59 | Hazard communication (applies 29 CFR 1910.1200) |
| 29 CFR 1926.95 | Criteria for personal protective equipment |
| 29 CFR 1926.96 | Occupational foot protection |
| 29 CFR 1926.97 | Electrical protective equipment |
| 29 CFR 1926.100 | Head protection |
| 29 CFR 1926.101 | Hearing protection |
| 29 CFR 1926.102 | Eye and face protection |
| 29 CFR 1926.103 | Respiratory protection (applies 29 CFR 1910.134) |
| 29 CFR 1926.150 | Fire protection |
| 29 CFR 1926.151 | Fire prevention |
| 29 CFR 1926.152 | Flammable liquids |
| 29 CFR 1926.153 | Liquefied petroleum gas (LP-Gas) |
| 29 CFR 1926.200 | Accident prevention signs and tags |
| 29 CFR 1926.251 | Rigging equipment for material handling |
| 29 CFR 1926.300 | Hand and power tools: general requirements |
| 29 CFR 1926.303 | Abrasive wheels and tools |
| 29 CFR 1926.350 | Gas welding and cutting |
| 29 CFR 1926.352 | Fire prevention (welding and cutting) |
| 29 CFR 1926.353 | Ventilation and protection in welding, cutting, and heating |
| 29 CFR 1926.404 | Wiring design and protection (GFCI / assured grounding program) |
| 29 CFR 1926.416 | Electrical safety-related work practices: general requirements |
| 29 CFR 1926.417 | Lockout and tagging of circuits |
| 29 CFR 1926.451 | Scaffolds: general requirements |
| 29 CFR 1926.452 | Scaffolds: specific types (incl. mobile scaffolds) |
| 29 CFR 1926.453 | Aerial lifts |
| 29 CFR 1926.454 | Scaffolds: training requirements |
| 29 CFR 1926.501 | Duty to have fall protection |
| 29 CFR 1926.502 | Fall protection systems criteria and practices |
| 29 CFR 1926.503 | Fall protection training requirements |
| 29 CFR 1926.601 | Motor vehicles |
| 29 CFR 1926.602 | Material handling equipment |
| 29 CFR 1926.1053 | Ladders |
| 29 CFR 1926.1060 | Training requirements (stairways and ladders) |
| 29 CFR 1926.1153 | Respirable crystalline silica |
| 29 CFR 1926.1153(g) | Respirable crystalline silica: written exposure control plan |
| 29 CFR 1926.1402 | Cranes: ground conditions |
| 29 CFR 1926.1417 | Cranes: operation |
| 29 CFR 1926.1424 | Cranes: work area control |
| 29 CFR 1926.1425 | Cranes: keeping clear of the load |
| 29 CFR 1926.1427 | Cranes: operator training, certification and evaluation |
| 29 CFR 1926.1428 | Cranes: signal person qualifications |
| 40 CFR Part 82, Subpart F | Refrigerant management (Clean Air Act Section 608): technician certification and venting prohibition |